Been a long 6 weeks, the only break was last Saturday when I stopped by Bola Custom Knives, and chatted with Carlos & Wade. I have one KITH knife done and need to put the handle on the other one.
This has been different, and I will be happy when I get off the back porch! Next South Flori-Dogs meeting will be at my place to break in the shop.
Made steps to get into shed
step done
Partition, pocket door, done. Insulation finished
Drywall, tape, and compound completed
walls painted and tile is in. Grout next
30 - 110v outlets
3 - 220v, 20 amp outlets
1 - 220v, 30 amp outlet
1 - 220v, 50 amp outlet
26 Fluorescent 48" lamps over 8 fixtures on 4 switches
6,000 BTU A/C on the clean side
2 floor fans and a Delta clean air unit on ceiling on fabrication side
extractor vent for forges
CO monitor next to forges 12" off floor
Cement backer boards under tile on floor
This has been a long WIP which I will finished after I get back from Blade. It will be grouted tomorrow.